Internal Tools Sprint
Built four internal tools in three weeks to solve urgent operational bottlenecks.
AI EnablementProblem SolvingRapid Prototyping
Problem
Four separate operational bottlenecks were each costing the small team real time every week.
What I built
Four narrowly-scoped internal tools, each built and shipped within three to five days.
My contribution
Identified the bottlenecks, scoped each tool tightly, and shipped all four solo.
Process
Triaged the bottlenecks
Picked the four causing the most weekly pain, not the most interesting.
Shipped narrow and fast
Built each tool to solve exactly one problem, nothing more.
Outcome
Each tool replaced a manual process that was actively blocking the team that week.